HX06

Back to Project Main Page

Scots pine canopy (April 17, 2006)
Scots pine canopy (April 17, 2006)
Scots pine canopy (May 15, 2006)
Scots pine canopy (May 15, 2006)
Standard set-up (X4)
In-canopy mast (X4)
Sonics (X1, X2, Y2)
Sonics (X1, X2, Y2)
Sample of a CSAT-3, Licor 7500 and gas multiplexer inlet (X4)
Sample of a CSAT-3, Licor 7500 and gas multiplexer inlet (X4)
View along the X-Array
View along the X-array
Array origin (Y2, X1, X2)
Array origin (Y2, X1, X2)
CSAT Array (X1 to X6))
CSAT array (X1 to X6))
Gill R2 Sonics (Y5)
Gill R2 sonics (Y5)
Sonic X6 seen from above (tower)
Sonic X6 seen from aloft
Overview of Setup including experimental profile tower
Overview of setup
Experimental profile tower at Y4 (University of Freiburg)
Experimental profile tower at Y4 (University of Freiburg)
Above canopy section
Above canopy section of tower
Experimental profile tower at Y4
Experimental profile tower at Y4
Metek sonics at profile tower (Y4)
Metek sonics (Y4)
Additional Sonic E4
Additional sonic E4
Additional Sonic E3
Additional sonic E3
Licor 7500 Field Calibration
Licor 7500 field calibration
Gasmultiplexer (CO2 and CH4)
Gas multiplexer (Li6262 and Innova 1312)
Licro 6262 Gas Multiplexer
Licro 6262 Gas Multiplexer
Mixing bottles at inlets
Mixing bottles at inlets
Gas Multiplexer Connections
Gas multiplexer xonnections
Adjusting the Scintillometers
Adjusting scintillometers
Scintillometer beam (S1)
Scintillometer beam (S1)
Scintillometer path (S1)
Scintillometer path (S1)
Parallel operation of two scintillometers (S1, S2)
Parallel operation of two scintillometers (S1, S2)
Hartheim Long-term tower (University of Freiburg)
Hartheim long-term tower (University of Freiburg)
Canopy
Canopy